Bradford University

Bradford

In 2010 SJM Where appointed by ISG Regions Bradford & Bradford University to carry out a two part supply and fix contract, this involved temporary joinery works and forming openings to the refurbishment of the old building and the building of a new extension to Bradford university. We first entered site to carry out a site set up this involved fitting temporary fire doors and forming access routes with the use of timber ramps and doors as well as fitting a roof to a outer storage building.

We then returned to site to carry out the forming of new openings and building of the new extension. This was yet another contract that required good site co-ordination due to limited access and the logistics of this architecturally challenging building, contract value £120,000
seperator
< back to list

 
side content
quote top
We have worked with SJM on numerous contracts and have found them to be very reliable and hard working. Their friendly 'can do' approach and their dedication to deliver a high standard of quality has led to us placing repeat business over several yea...read more >quote bottom
Andrew Walker, Director
QSP Construction
For work completed on St.Beads Phase 1 & 2, Bramhope Rugby Club, Museum and Stables Retford

SERVICES

  • Refurbishment
  • Listed & Historic Building
  • Dry-stone Walls
  • Industrial & Commercial
  • Office & Leisure
  • House Builds & Extensions
  • Gardens & Landscaping